Sök:

Sökresultat:

3086 Uppsatser om Wind power plants - Sida 1 av 206

Faktorer som påverkar vindkraftsutbyggnaden

Wind power is expanding rapidly in Sweden. Increasing amounts of wind power sets higher requirements on balancing power and grid expansions and would affect the whole Swedish electricity system. The aim of this report is to examine the factors affecting the wind power expansion in Sweden. How many Wind power plants projects will obtain building permissions and what costs and revenues can be expected? How much balancing power will be required and does a changing geographical distribution of the Wind power plants reduce the need of balancing power?A survey of the county board?s official applications has been made and out of all the applications, corresponding to 80 TWh produced per year, about half of the applications are expected to obtain a permit with a major portion of them located in the north of Sweden.Especially older Wind power plants, deriving revenue from Nord pool, find themselves today in a complicated financial situation.

Håller vindkraften vad den lovar?

The purpose of this study is to investigate how much of the estimated annual electric energy production from Swedish wind power that actually was produced, as well as the history of this agreement over time. The aim is to also examine if there are properties that have caused some group of Wind power plants to produce more or less, compared to their estimated production. Operational data on wind turbines collected by the Swedish Energy Agency was analyzed. A survey was made among owners of Wind power plants with a nominal power of at least 2 MW. Two different methods for normal year correction of production data were used and compared.

Tillförlitlighet hos trafikolycksklassificering

Today?s Wind power plants are only compensated for their reactive power consumption at no-load. As the Wind power plants grow bigger the amount of reactive power they need also increases. This is no longer a problem that can be ignored, especially as the net owners are beginning to charge the reactive power they transport.In this thesis a couple of different methods of compensation and their prices will be discussed and evaluated. Problems, such as self-excitation, that can occur if one fully compensates the wind power plant will also be brought to surface.

Undervattensvågbrytare - En modellstudie

Today?s Wind power plants are only compensated for their reactive power consumption at no-load. As the Wind power plants grow bigger the amount of reactive power they need also increases. This is no longer a problem that can be ignored, especially as the net owners are beginning to charge the reactive power they transport.In this thesis a couple of different methods of compensation and their prices will be discussed and evaluated. Problems, such as self-excitation, that can occur if one fully compensates the wind power plant will also be brought to surface.

Kompensering av reaktiv effekt vid vindkraftverk

Today?s Wind power plants are only compensated for their reactive power consumption at no-load. As the Wind power plants grow bigger the amount of reactive power they need also increases. This is no longer a problem that can be ignored, especially as the net owners are beginning to charge the reactive power they transport.In this thesis a couple of different methods of compensation and their prices will be discussed and evaluated. Problems, such as self-excitation, that can occur if one fully compensates the wind power plant will also be brought to surface.

Testplattform för nätverks-RTK i syfte att ge en rikstäckande GPS-tjänst med centimeternoggrannhet

Today?s Wind power plants are only compensated for their reactive power consumption at no-load. As the Wind power plants grow bigger the amount of reactive power they need also increases. This is no longer a problem that can be ignored, especially as the net owners are beginning to charge the reactive power they transport.In this thesis a couple of different methods of compensation and their prices will be discussed and evaluated. Problems, such as self-excitation, that can occur if one fully compensates the wind power plant will also be brought to surface.

Trafiken till Göteborgs södra skärgård - En annorlunda kollektivtrafik

Today?s Wind power plants are only compensated for their reactive power consumption at no-load. As the Wind power plants grow bigger the amount of reactive power they need also increases. This is no longer a problem that can be ignored, especially as the net owners are beginning to charge the reactive power they transport.In this thesis a couple of different methods of compensation and their prices will be discussed and evaluated. Problems, such as self-excitation, that can occur if one fully compensates the wind power plant will also be brought to surface.

Rostfritt stål som ett alternativt material till koppar i tappvattenledningar för bostäder

Today?s Wind power plants are only compensated for their reactive power consumption at no-load. As the Wind power plants grow bigger the amount of reactive power they need also increases. This is no longer a problem that can be ignored, especially as the net owners are beginning to charge the reactive power they transport.In this thesis a couple of different methods of compensation and their prices will be discussed and evaluated. Problems, such as self-excitation, that can occur if one fully compensates the wind power plant will also be brought to surface.

Vindkraftsplanering i skogsmark

The aim of this study about wind power planning in forest was to examine the factors and restrictions, which represent technical limitations, biodiversity, tourism and amount of energy for wind farms in Kronoberg County. Suitable areas for wind power were identified from the collected information about planning principles and potential conflicts. From the suitable areas the potential energy gain is calculated. Methods used were mainly a literature review, interviews with experts and practitioners, GIS analysis and a rough calculation of the energy gain. The section of information and facts describes in general wind power planning and possible conflicts.

Lönsamheten i vindkraft : en studie om den förväntade lönsamheten i landsbaserad vindkraft

This thesis analyzes the expected profitability in land based Wind power plants. The expected profitability is calculated on the basis of a wind power project in Vartofta, Falköping. The information required to calculate the expected outcome is then concentrated to this project, which is in this thesis called project Näs. In project Näs they plan to build three Wind power plants, with each an effect of 2 MWh. These Wind power plants are very capital intensive investments with a long and uncertain payback time.

Vägar och markanspråk inom vindkraftsparker i Västerbottens län : Hur verkliga mått förhåller sig till vad som uppges i miljökonsekvensbeskrivningar

The purpose of this study was to increase the level of knowledge in the field of Environmental Impact Assessment (EIA) for wind power. The study includes six wind power farms in the County of Västerbotten in northern Sweden. The main questions were: What are the real dimensions of roadways and land claims for both roads and wind power turbines? How do those dimensions correlate with the dimensions stated in the EIA? Are there any differences in values of the dimensions between the wind power farms that are included in this study? The width of the roadways and the land claims for both roads and wind turbines in wind power farms were examined on site. The results from the examinations were compared with the dimensions available in the EIA for each wind power farm.

Meningen med meningsförändrande innovation inom robotikbranschen : En explorativ fallstudie

The purpose of this study was to increase the level of knowledge in the field of Environmental Impact Assessment (EIA) for wind power. The study includes six wind power farms in the County of Västerbotten in northern Sweden. The main questions were: What are the real dimensions of roadways and land claims for both roads and wind power turbines? How do those dimensions correlate with the dimensions stated in the EIA? Are there any differences in values of the dimensions between the wind power farms that are included in this study? The width of the roadways and the land claims for both roads and wind turbines in wind power farms were examined on site. The results from the examinations were compared with the dimensions available in the EIA for each wind power farm.

Rätt gåva för rätt tillfälle

This master thesis is a study of the Swedish hydropower capacity to balance wind power. The Swedish government has decided that it should be possible to produce 30 TWh from wind power in the year 2020. The Swedish municipalities have to have plans for Wind power plants with total yearly generation of 30 TWh. Wind power is an variable energy source that needs to be balanced by other energy sources. In Sweden the Swedish hydropower can be used for balancing a large scale introduction of wind power.

Balansering av en storskalig vindkraftsutbyggnad i Sverige med hjälp av den svenska vattenkraften

This master thesis is a study of the Swedish hydropower capacity to balance wind power. The Swedish government has decided that it should be possible to produce 30 TWh from wind power in the year 2020. The Swedish municipalities have to have plans for Wind power plants with total yearly generation of 30 TWh. Wind power is an variable energy source that needs to be balanced by other energy sources. In Sweden the Swedish hydropower can be used for balancing a large scale introduction of wind power.

Utvärdering av svensk vindkraft : Skillnaden mellan skogs- och traditionella placeringar

During the last years commercial Wind Power Turbines (WPT) has become larger regardingto the generator sizes and hub heights. Available hub heights around 100 meters is nowcommon, which has led to profitability for WPT located in forests where there normally are tolow wind speeds. The current knowledgement regarding turbulence and the variation in thewind profile for the outcome of the power production for the WPT in forests is limited.In this Master of Science thesis an investigation concerning forest located Wind power plantshas been made. The purpose has been to investigate if plants located in forest perform lesscompared to wind power turbines located at more common locations.The analyses are based on statically material for determining the availability,production/generator size, production/hub height, production/swept area and how thetopography affect the production results.The analyses show that the variation in production result for WPT located in forest comparedto turbines located at other locations is small. The availability is high and the productionresults are good..

1 Nästa sida ->